Projects
Undergraduate Research Students Funded Projects Supervised
2024
-
Erin Knight, Emmanuel Enemuoh, “Modeling and Mapping of Microstructure of Powder Bed Direct Metal Laser Sintering Additive Manufacturing Hybrid Milling of Maraging Steel,” UMD Undergraduate Research Opportunity Program (UROP), $1800.
-
Daniel Wetherby, Emmanuel Enemuoh, “Evaluation of High-Temperature Mechanical Properties, Physical Properties, and Energy Consumption of Fused Deposition Modeling of PEEK,” UMD Undergraduate Research Opportunity Program (UROP), $1800.
2020
-
2020, Jeffrey Kangas “Mechanical Properties of Carbon Fiber Laminate in Elevated Temperatures” UMD Undergraduate Research Opportunity Program (UROP), $1800
-
2020, Jaydon Johnson “Non-Destructive Evaluation of Coconut Quality: Comparative Evaluation of Techniques” UMD Undergraduate Research Opportunity Program (UROP), $1800
2019
-
2019, Paulson, Aaron, “Modeling the Response in the Fatigue of an Elemental Carbon Fiber Laminate Due to a Harmonic Dynamical Load, ” UMD Undergraduate Research Opportunity Program (UROP), $1800
-
2019, Manley-Spain, Godfree, “Numerical Modeling and Evaluation of Ultrasound in Nonhomogeneous Boundaries, UMD UROP $1800
2014
-
2014, Bharndari, Pranav, “Development and Evaluation of Piezoelectric Energy Harvesting System,” UMD UROP, $1700
-
2014, Sunjung, Kim, “Engineering Sustainability of Carbon Fiber Composite Materials: Comparative Analysis,” UMD UROP $1700
-
2014, Scott, Benjamin, “Development and Evaluation of a Support System for Selection of Additive Manufacturing Process,” UMD UROP, $1700
2013
-
2013, Wagner, Karl S., “Development and Evaluation of Composite Materials for 3D-Printing,” UMD UROP, $1700
-
2013, Aylward, Michael, “Life Cycle Analysis of Lithium-Ion Electric Vehicle Battery,” UMD UROP, $1700
2012
-
2012, Guo, Sicong, “Exploration of Sustainable Approach to Construction of Constant Life Diagrams: Titanium Alloy (Ti-6AL-4V),” UMD UROP $1700
-
2012, Vechirko, Vadim, “Development and Characterization of Glass Fiber Reinforced Multifunctional CNT/Epoxy Composite Structures,” UMD UROP $1700
-
2012, Hensel, Bradley, “Development of Flexible Machine Center for CNC Milling and 3D Printing,” UMD UROP, $1700
2011
-
2011, Gustafon, Chris, “Design & Development of Motorized Bicycle with Integrated Safety Lighting Composite Frame,” UMD UROP, $1700
-
2011, Schmdberger, Alex, “Development of Advanced Composites for use in Military Armor,” UMD UROP, $1680
2010
-
2010, Rau, Jeremiah, “Development of Multifunctional CNT/Epoxy Composite,” UMD UROP, $1700
2007
-
2007, Vohra, Muhammad H., “Comprehensive Evaluation of Photovoltaic cells Design, Choice of Materials, and Production Methods,” UMD UROP $1700
2006
-
2006, Seide, Mike, “Design, Fabrication, and Implementation of a Submersible
-
Ultrasonic Scanning Inspection System,” UMD UROP $1700
2004
-
2004, Otto, Cory, “Using Acousto-Ultrasonics to Monitor and Detect Delamination in Advanced Composite Materials,” UMD UROP. $1700
Industry Projects Supervised
“Design, manufacture and analyze an automated deburring system which will reduce the time required for the deburring process and eliminate the risk of repetitive motion injuries,”
-
Parker Hannifin Corperation, Grantsburg, WI, USA
-
Students: Dave Nehls, Daniel Beal, Nicholas Belgum, Parker Kerslake, Adam Plakut
-
Project Supervisors: Enemuoh, E.U., Lee, J.B., Swaminathan, P.D., Duttagupta, A. (GTA)
-
2017 Direct Costs: $10,000 Total Costs: $11,500
“Design, analyze and manufacture boom seam table clamp, which will increase the overall ergonomics of the mandrel/carriage system currently in operation and increase overall productivity,”
-
Altec Industries Duluth, MN, USA
-
Students: Evan Quaas, Nick Krouse, Alex Williamson, Jordan Murphy, Nick Beduhn
-
Project Supervisors: Enemuoh, E.U., Lee, J.B., Swaminathan, P.D., Duttagupta, A. (GTA)
-
2017 Direct Costs: $9,000 Total Costs: $10,500
“Develop and implement a test procedure for evaluation of repair techniques: polyflakes, metallization and ceramic materials.,”
-
Northern Engineering Works, Superior, WI, USA
-
Students: Jack Weyenberg, Isaac Kidd, Nick Patrias, Elizabeth Condon
-
Project Supervisors: Enemuoh, E.U., Lee, J.B., Swaminathan, P.D., Duttagupta, A. (GTA)
-
2017 Direct Costs: $5,000 Total Costs: $6,500
“Design an effective hydraulic test stand for the evaluation of motors and swivels, which will allow the company to address associated warranty costs effectively,”
-
Genesis Attachments, Superior, Wisconsin, USA
-
Students: J. Hutar, R. Sedlachek, A. Thorpe, R. Kirkpatrick, D. Franklin, J. Speight, C. Hehn
-
Project Supervisors: Enemuoh, E.U., Lee, J.B., Swaminathan, P.D., Duttagupta, A. (GTA)
-
2017 Direct Costs: $50,000 Total Costs: $51,500
“Design and develop a hybrid rocket engine, which is capable of flying over 30,000 feet to compete at the 2018 Intercollegiate Rocket Engineering Competition (IREC),”
-
UMD Bulldog Rocketry Club
-
Students: Ethan Vought, Brenden Bungert, Chet Peterson, Evan Boncher
-
Project Supervisors: Enemuoh, E.U., Lee, J.B., Swaminathan, P.D., Duttagupta, A. (GTA)
-
2017 Direct Costs: $5,000 Total Costs: $6,1500
“Design and build a working prototype of a lapping machine which can undertake the combined production capabilities of three other outdated lapping machines thereby decreasing the amount of time spent lappinp,”
-
Graco Inc., Minneapolis, USA
-
Students: Sam Olson, Ben Schmitz, Jon Nowak, Nick Rokus, Jeff Loftus, Zach Gerth
-
Project Supervisors: Enemuoh, E.U., Lee, J.B., Swaminathan, P.D., Duttagupta, A. (GTA)
-
2017 Direct Costs: $50,000 Total Costs: $51,000
“Design and manufacture an unmanned aerial vehicle (UAV) to inspect 110ft pulp digesters effectively by providing them with real time footage using a high definition (HD) camera,”
-
Insight Environment Inc., Superior, Wisconsin, USA
-
Students: Robert Mouton, Joel Stomberg, Brandon Pittman, Evan Thielen, Alex Stecker, Jake Hoover
-
Project Supervisors: Enemuoh, E.U., Lee, J.B., Swaminathan, P.D., Duttagupta, A. (GTA)
-
2017 Direct Costs: $10,000 Total Costs: $11,500
“Design, built, implement and analyze a wire mesh health monitoring system to monitor the health of wire mesh forming line, such that more informed decision can be made with regards to its replacement times,”
-
USG Interiors Inc., Cloquet, MN, USA
-
Students: Mike O’Keefe, Alec Kadlec, Kevin Weber, Seth Holmes, Seth Vogt
-
Project Supervisors: Enemuoh, E.U., Lee, J.B., Swaminathan, P.D., Duttagupta, A. (GTA)
-
2017 Direct Costs: $10,000 Total Costs: $11,500
“Design and validate a cooled exhaust gas circulation system specific to the needs of a four stroke engine utilized by the UMD Clean Snowmobile Club.”
-
UMD Clean Snowmobile Club
-
Students: Mark Boeckmann, Travis Kramer, Ethan Ault, Charlie Pierucki
-
Project Supervisors: Enemuoh, E.U., Lee, J.B., Swaminathan, P.D., Duttagupta, A. (GTA)
-
2017 Direct Costs: $ Total Costs: $3,000
“Design and incorporate a fail-proof system ball bearing installation procedure for ¼” 60-series quick connect hydraulic couplings to increase parts assembly by 6% and eliminate spilling,”
-
Parker Hannifin Corporation, Grantsburg, WI, USA
-
Students: Miguel Elizondo, Nick Van Watermeulen, Milayna Beadell, Colin Brown
-
Project Supervisors: Enemuoh, E.U., Lee, J.B., Duttagupta, A. (GTA)
-
2017 Direct Costs: $8,000 Total Costs: $9,500
“Design and analyze 55-gallon universal hydraulic oil tank and mounting bracket that is compatible with all Builtrite Handlers and Attachments model: 88, 1010, 1300, and 2200 Truck Mounted Material Handlers,”
-
Builtrite Manufacturing, Two Harbors, MN, USA
-
Students: Julio Romero; Krista Arnevik; Kaz Anderson; Ana Gonzalez
-
Project Supervisors: Enemuoh, E.U., Lee, J.B., Duttagupta, A. (GTA)
-
2016 Direct Costs: $5,000 Total Costs: $6,500
“Design and implement a high quality test bench for Graco Husky 1050 Air Operated Double Diaphragm (AODD) Pump,”
-
Graco Inc., Minneapolis, USA
-
Students: Yuan Nguetio; Faris Midyan; Joseph Svegal; Taylor Sieberg
-
Project Supervisors: Enemuoh, E.U., Lee, J.B., Duttagupta, A. (GTA)
-
2016 Direct Costs: $7,500 Total Costs: $9,000
“Design and implementation of linear tilt positioner fixture to reduce manufacturing time of stickbodies and subheads while allowing the employees to work in a safe and ergonomic environment,”
-
Genesis Attachments, Superior, Wisconsin, USA
-
Students: Kyle Wilson; Paul Miller; Andrew Brownson; Jake Lynch
-
Project Supervisors: Enemuoh, E.U., Lee, J.B., Duttagupta, A. (GTA)
-
2016 Direct Costs: $15,000 Total Costs: $16,500
“Design and implement a new assembly cell that consolidates the workload of two cells down to one at Parker Hannifin plant,”
-
Parker Hannifin Corporation, Grantsburg, WI, USA
-
Students: Weston Ogren; Michael Lenzen; Derek Danielson
-
Project Supervisors: Enemuoh, E.U., Lee, J.B., Duttagupta, A. (GTA)
-
2016 Direct Costs: $5,000 Total Costs: $6,500
“Design and build a new age mechanical mule for the United States Air Force (USAF) Special Operations Forces (SOF) to carry heavy loads over rough terrain,”
-
United States Air Force
-
Students: William Sell; Daniel Joyce; Esten Langlie; Ciera Rife
-
Project Supervisors: Enemuoh, E.U., Lee, J.B., Duttagupta, A. (GTA)
-
2016 Direct Costs: $20,000 Total Costs: $20,000
“Implementation of methods of visual communication, 5S improvements, and S.M.E.D. techniques for Parker Hannifin that will reduce setup time by 50%.,”
-
Parker Hannifin Corporation, Grantsburg, WI, USA
-
Students: Kevin Knutson; Eric Sammer; Benjamin Suter; Sean Smith
-
Project Supervisors: Enemuoh, E.U. and Al-Geddawy,T.
-
2016 Direct Costs: $5,000 Total Costs: $6,500
“Design, manufacture and implement a new hose reel assembly fixture that will eliminate wasted time, bolster production, and increase safety for the Graco facility located in Rogers, MN,”
-
Graco Inc., Rogers, MN, USA
-
Students: Tyler Brunjes, Timothy Ronkainen, Justin Rees, Luc Desroches, Brady Lawrence.
-
Project Supervisors: Enemuoh, E.U. and Al-Geddawy, T.
-
2016 Direct Costs: $30,000 Total Costs: $31,500
“Design, develop, and implement Aero-glove system that will allow descend from medium, heavy, and tilt rotor aircraft for USA Airforce,”
-
USA Air Force
-
Students: Nick Tokar; Ian Anderson; Will Feyder; Allen Dotzenrod
-
Project Supervisors: Enemuoh, E.U. and Al-Geddawy,T.
-
2016 Direct Costs: $7,500 Total Costs: $7,500
“Design, build and test a Tactical Acceleration Control (TAC) Tube for the USA Air Force Special Operations Forces to deploy from heavy lift helicopters and tilt rotor aircraft ranging in altitude of 20 to 90ft.,”
-
USA Air Force
-
Students: Ryan Farrelly; Dustin Cavallin; Nick Johnston; Brooks Zamzow
-
Project Supervisors: Enemuoh, E.U. and Al-Geddawy,T.
-
2016 Direct Costs: $7,500 Total Costs: $7,500
“Design, test and implement a scalable ball-and-seat verification system for Graco-Minneapolis to decrease part mismatch while increasing customer satisfaction and maintaining current process time,”
-
Graco Inc., Minneapolis, USA
-
Students: Jacob Searl; Dustin Chevalier; Saif Hassan; Karl Wallander
-
Project Supervisors: Enemuoh, E.U. and Al-Geddawy,T.
-
2016 Direct Costs: $10,000 Total Costs: $11,500
“Design and improve upon the current XT Mobile (GXT) Shear design to eliminate upper and lower blade interference of Genesis Attachments,”
-
Genesis Attachments, Superior, Wisconsin, USA
-
Students: Tyler Liermann; Nathan Meyer; Lauren Novak; Nicholas Melton
-
Project Supervisors: Enemuoh, E.U. and Al-Geddawy,T.
-
2016 Direct Costs: $5,000 Total Costs: $6,500
“Design, analyze and implement a new work cell layout and part schedule that allows one CNC operator to operate two CNC machines,”
-
Superior Lidgerwood Mundy Co, Superior, WI, USAS
-
tudents: Noah Alm; Garrett Busch; Jade LeCoq
-
Project Supervisors: Enemuoh, E.U. and Al-Geddawy.T.
-
2016 Direct Costs: $5,000 Total Costs: $6,500
“Research and development of reuse alternatives of over 525,000 pounds of non-biodegradable waste produced from Epicurean’s CNC routing process,”
-
Epicurean, Duluth, MN, USA
-
Students: Ben Hopwood, Taylor Huber, Brandon Lindquist, Timothy Katka
-
Project Supervisors: Enemuoh, E.U. and Al-Geddawy,T.
-
2016 Direct Costs: $5,000 Total Costs: $6,500
“Design, test, and validation of a quality optical viewing window assembly that can be incorporated into JARPs existing pressure vessels,”
-
JARP Industries, Inc., Winsted, WI
-
Students: Nicole Sovde, Eliah Hauser, Andrew Hemenway, Michael Vogel
-
Project Supervisors: Enemuoh, E.U. and Al-Geddawy,T.
-
2016 Direct Costs: $10,000 Total Costs: $11,500
“Design, manufacture, and implement an efficient hydraulic testing fixture to troubleshoot hydraulic outrigger cylinder drift for Altec’s AH100 and AH125 trucks,”
-
Altec Inc., Duluth MNS
-
tudents: Aaron Ophoven, Charlie Gordon, Spencer Johnson, Adam Holter, Pranav Bhandari
-
Project Supervisors: Enemuoh, E.U. and Al-Geddawy,T.
-
2016 Direct Costs: $10,000 Total Costs: $11,500
“Design, manufacture, and implementation of a new ventilation drying system that is within various parameters defined by ME Elecmetal and adheres to safety regulations from OSHA and applicable laws,”
-
ME ElecMetal, Duluth, MN, USA
-
Students: James Tarbuck, Jasmine Moist, Austen Jones, Anthony Nguyen.
-
Project Supervisors: Enemuoh, E.U. and Al-Geddawy,T.
-
2016 Direct Costs: $10,000 Total Costs: 11,500
“Design and determine the feasibility of implementing a fully automated operations cell for manufacturing the Parker-Hannifin 60 Series valves to reduce operating costs,”
-
Parker-Hannifin, Grantsburg, WI
-
Students: Kristopher Brown, Alexander Mikl, Brandon Tomlyanovich, Neal Rowe, Samuel Morrison.
-
Project Supervisors: Enemuoh, E.U. and Al-Geddawy,T.
-
2016 Direct Costs: $5,000 Total Costs: $6,500
“Design and develop a stress monitoring system that monitors the boom location relative to the other side booms in order to determine the stress along the pipe and deliver it to Lake Superior Consulting,”
-
Lake Superior Consulting, Duluth, MN
-
Students: Connor Edlund, Kevin Prochaska, Colton Thomas, Anthony McMahon.
-
Project Supervisors: Enemuoh, E.U. and Al-Geddawy,T.
-
2016 Direct Costs: $10,000 Total Costs: $11,500
“Design and implementation of a new facility layout and a base plate for the test mount and assemble of the truck mounted material handlers to decrease labor times by 33% for Builtrite,”
-
Builtrite, Two Harbors, MN
-
Students: Ben Hopwood, Taylor Huber, Brandon Lindquist, Timothy Katka.
-
Project Supervisors: Enemuoh, E.U. and Al-Geddawy,T.
-
2016 Direct Costs: $9,000 Total Costs: $10,500
“Develop a motorization system for Mr. Martin P. Ferkul’s “Cargo Handling System,” and refine the current product for the consumer market,”
-
Martin Ferkul – Inventor/Entrepreneur
-
Students: Spencer Buss, Sam Torrinen, Zach Bouska, Steve Aro
-
Project Supervisors: Enemuoh, E.U. and Al-Geddawy,T.
-
2016 Direct Costs: $8,000 Total Costs: $8,000